930MWe CCPP Major Inspection Work

930MWe CCPP Major Inspection Work

930MWe CCPP Major Inspection Work

The Mitsubishi M701F gas turbine major maintenance work and steam turbine minor maintenance were successfully completed in Enerjisa and Mitsubishi supervision at 930mwe Bandirma Enerjisa ccpp.

Working scope;

  • Dismantling/assembling GT noise enclosure and instruments
  • GT Dismantling/Assembly,
  • Hot Gas Path Maintenance,
  • Combustion Chambers Eye Control-maintenance, change of ceramics and nozzles (burner),
  • Gas turbine compressor Stage maintenance,
  • Control and maintenance of turbine bearings,
  • Fixed-moving wings change,
  • Oil tanks, oil pumps and oil heat exchangers maintenance, oil changes
  • Dismantling/assembling the generator rotor, removal of coolers, maintenance and pressure tests,
  • Control and maintenance of generator bearings,
  • Generator warning System dismantling/maintenance,
  • Generator stator windings control, change and maintenance,
  • Maintenance of generator auxiliary systems,
  • Steam turbine general valve assembly dismantling and maintenance,
  • Air ıntake Unit Maintenance and filter replacement,
  • Turbine coupling adjustment,
Shall we talk about what we can do for your next project?
Contact Us