Siemens N6 5.3 MW counter pressure steam turbine and generator maintenance was completed under the supervision of Siemens within the scope of steam turbine revision in Eti-Maden Boron and Acid Factories Plant.

The scope is as follows:

  • Turbine enclosure disassembly
  • Dismantling and numbering of turbine cushion insulation
  • Dismantling and maintenance of turbine upper / lower case
  • Dismantling and maintenance of turbine valve
  • Dismantling of the turbine main lubrication pump group
  • Disassembly of fixed blades of turbine interior
  • Turbine rotor disassembly
  • Dismantling of all turbine bearings and dismantling and maintenance of front pedestal
  • Sandblasting of turbine rotor, fixed blades, upper / lower casings and studs with glass ball
  • Correction of flange surface of turbine main steam outlet pipe by mobile lathe
  • Gearbox, big gear and pinion gear disassembly and assembly, replacement of big gear and pinion gear
  • Leveling operations in gear box carrier chassis
  • Generator housing and warning disassembly and maintenance
  • Generator lubeoil line disassembly
  • Disassembly and replacement of generator bearings and pedestals
  • Disassembly of generator stator and rotor