Siemens supervision of 2 × 154 MW SıEMENS V 94.2 gas turbines and 1 × 182 MW ST-1 steam turbine minor maintenance work (investigation of GT combustion chambers, the opening of steam turbine bearings and other minor maintenance works

Technical workforce support for studies under Trakya Elektrik

Boiler Feed water pumps located in CT-1A (11) and CT-1B (12) units, the dismantling, installation and coupling settings of the electric drive units (WESTıNGHOUSE)

Checking the coupling control of the BOP pumps on the field and comparing it with the old data

Dismantation of Valves on HP drums belonging to both boilers, periodic maintenance and reassembly of the workshop

High pressure water cleaning of heat exchanger plates on the condenser line

Performing all surface preparation procedures for replica and hardness measurements on the main steam lines of both boilers

Detailed cleaning of air intake filter modules and air intake system bottom part

In the facilities of 478MW Trakya Elektrik Imalat A.Ş., minor maintenance works were completed under the supervision of Trakya Elektrik and Siemens.