GT13E2 ALSTOM Gas turbine and 1 Alstom steam turbine major maintenance work were completed under the supervision of Unimar and Alstom with our team of 277 people in Unimar Enerji Investments A.Ş. power Plant/Marmara Ereğlisi with total installed power of 480 MW.

The maintenance scope is as follows:

  • GT2 Combustion chamber dismantation and maintenance, installation
  • The dismantation and maintenance of GT2 burners with a new replacement and installation
  • Combustion Chambers Ceramic dismantation and replacement of the necessary ones
  • GT2 Rotor dismant,
  • Changing the wings of the turbine side required stages
  • Renewal of the blades of the required stages of the compressor side
  • GT2 Exhaust Diffuser Unit Renewal
  • Compressor vane carrier (CVC), turbine vane carrier (TVC) dismantings, cleaning and installation
  • Dismantling, maintenance and installation of the IGV Blades
  • Maintenance and installation of fixed blades and labyrinths
  • ST LP Rotor Disassembly
  • ST HP/IP Rotor Disassembly
  • Steam turbine to sand the HP/LP rotors
  • ST-GT2-generators oil sealing gland disassembly, labyrinth measures, maintenance
  • Generator opening of manhole covers and performing stator inspection with Videoscope
  • GT2 insulation and stone wool dismantation and erection
  • Scaffolding works
  • BOP jobs (Maintenance of various pumps and valves).
  • ST valve dismantling and assembly activities