Baymina Power Plant Maintenance Works

Baymina Power Plant Maintenance Works
:
Baymina Energy
:
Ankara
:
2012
:
At Baymina Power Plant, the works we have completed with our 290-person team within the scope of planned maintenance > Renewal of duct burner zone sheets in boiler 1 and boiler 2, stainless steel coating on inner surface and exchange of internal and external insulation,> Renewal of thinning zones of blow down tank sheet,> Condenser cleaning with pressurized water,> Within the framework of calibration agreement with Baymina Energy calibration of 303 transmitters, switches and thermo elements on gas turbines and steam turbines and auxiliary systems,> under Baymina supervision, maintenance of BOP pumps, maintenance of cooling fans, electrical-I & C works, air intake filter replacement,> electricity to gas turbines under GE supervision. support team,> On-site general scaffolding assembly and disassembly, Isolation works Maintenance work was completed without any problem and the unit was commissioned.