AKSA Acrylic Chemical Coal Fired Power Station Maintenance Works

AKSA Acrylic Chemical Coal Fired Power Station Maintenance Works

AKSA Acrylic Chemical Coal Fired Power Station Maintenance Works

2 steam turbines, pumps, fan maintenance, impeller cleanings, NDT controls, coupling settings, vibration measurements and instrument calibrations in Yalova Aksa acrylic plant with success in Aksa acrylic supervisor Completed.

Maintenance coverage;

  • PA, FD, SA, ID and instrument cooling fan mattress maintenance, bearing changes, measurement controls, impeller cleaning, NDT, vibration measurements, coupling settings and commissioning work,
  • KSB feedwater pumps, Andritz circulation pumps, dismantling Quencher hydrocyclone pumps, maintenance and installation, vibration controls, coupling settings and commissioning work,
  • Instrument Calibration Works,
  • 75 MW AEG Steam turbine valve and mattress maintenance works,
  • 25 MW SKODA Steam tube valve and bearing maintenance works